PRICES include / exclude VAT
Homepage>ASTM Standards>91>91.010>91.010.20>ASTM E2168-10R16 - Standard Classification for Allowance, Contingency, and Reserve Sums in Building Construction Estimating
Sponsored link
Not available online - contact us!
Released: 01.05.2016

ASTM E2168-10R16 - Standard Classification for Allowance, Contingency, and Reserve Sums in Building Construction Estimating

Standard Classification for Allowance, Contingency, and Reserve Sums in Building Construction Estimating

CURRENCY
57.78 USD
Standard number:E2168-10R16
Released:01.05.2016
Status:Active
Pages:8
Section:04.12
Keywords:allowance; budgeting; building economics; classification; construction estimating; contingency; cost control; cost estimating; cost planning; cost risk; reserve; UNIFORMAT II;
DESCRIPTION

1.1 This classification establishes a classification for allowance, contingency, and reserve sums used in construction, project, and program estimating.

1.2 This classification applies to all construction work.

1.3 This classification is not based on permanent physical elements of construction (as defined and classified in Classification E1557). Rather, the classification items are cost components common to construction, project, and program estimates.