PRICES include / exclude VAT
Homepage>BS Standards>25 MANUFACTURING ENGINEERING>25.040 Industrial automation systems>25.040.01 Industrial automation systems in general>BS EN IEC 62439-3:2018 Industrial communication networks. High availability automation networks Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)
Sponsored link
immediate downloadReleased: 2018-03-16
BS EN IEC 62439-3:2018 Industrial communication networks. High availability automation networks Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)

BS EN IEC 62439-3:2018

Industrial communication networks. High availability automation networks Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)

Format
Availability
Price and currency
English Secure PDF
Immediate download
486.20 USD
English Hardcopy
In stock
486.20 USD
Standard number:BS EN IEC 62439-3:2018
Pages:174
Released:2018-03-16
ISBN:978 0 580 93197 0
Status:Standard
DESCRIPTION

BS EN IEC 62439-3:2018


This standard BS EN IEC 62439-3:2018 Industrial communication networks. High availability automation networks is classified in these ICS categories:
  • 35.110 Networking
  • 35.100.05 Multilayer applications
  • 35.040.01 Information coding in general
  • 25.040.40 Industrial process measurement and control
  • 25.040.01 Industrial automation systems in general
IEC 62439-3:2016 is available as IEC 62439-3:2016 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.

IEC 62439-3:2016 is applicable to high-availability automation networks based on the Ethernet technology. This part of IEC 62439 specifies two redundancy protocols designed to provide seamless recovery in case of single failure of an inter-bridge link or bridge in the network, which are based on the same scheme: parallel transmission of duplicated information. This third edition cancels and replaces the second edition published in 2012. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition:
- technical corrections and extension of specifications;
- consideration of IEC 61588 clock synchronization with end-to-end delay measurement alongside the existing peer-to-peer delay measurement in PRP.