PRICES include / exclude VAT
Sponsored link
immediate downloadReleased: 2016-01-31
PD CEN ISO/TS 16530-2:2015 Well integrity Well integrity for the operational phase

PD CEN ISO/TS 16530-2:2015

Well integrity Well integrity for the operational phase

Format
Availability
Price and currency
English Secure PDF
Immediate download
408.20 USD
English Hardcopy
In stock
408.20 USD
Standard number:PD CEN ISO/TS 16530-2:2015
Pages:100
Released:2016-01-31
ISBN:978 0 580 81937 7
Status:Standard
DESCRIPTION

PD CEN ISO/TS 16530-2:2015


This standard PD CEN ISO/TS 16530-2:2015 Well integrity is classified in these ICS categories:
  • 75.180.10 Exploratory, drilling and extraction equipment

This Technical Specification provides requirements and methods to the oil and gas industry to manage well integrity during the well operational phase.

The operational phase is considered to extend from handover of the well after construction, to handover prior to abandonment. This represents only the period during the life cycle of the well when it is being operated and is illustrated in Figure 1.

The scope of the Technical Specification includes:

  • A description of the processes required to assess and manage risk within a defined framework. The risk assessment process also applies when deviating from this Technical Specification.

  • The process of managing well integrity by operating wells in compliance with operating limits for all well types that are defined based on exposure of risk to people, environment, assets and reputation. The management of well integrity is supported by associated maintenance/monitoring plans, technical reviews and the management of change.

  • The assessment of existing assets (wells / fields) in order to start the process of Well Integrity Management in accordance with this technical specification.

  • The handover process required when changing from one activity to another during the operational phase.

The scope of the Technical Specification applies to all wells that are utilized by the oil and gas industry, regardless of their age, type or location.

The scope of the Technical Specification does NOT apply to:

  • The periods during well intervention or work-over activities but it DOES include the result of the intervention and any impact that this can have to the well envelope and the associated well barriers.

  • The equipment that is required or used outside the well envelope for a well intervention such as wire-line or coiled tubing or a pumping package.

[Image removed.]