Dear customers, all orders for hardcopy versions will be sent on 6th January 2026, we wish you a Merry Christmas and a Happy New Year

PRICES include / exclude VAT
>BSI Standards >29 ELECTRICAL ENGINEERING>29.020 Electrical engineering in general>BS EN 62561-3:2017 Lightning protection system components (LPSC) Requirements for isolating spark gaps (ISG)
Not available online - contact us!
immediate downloadReleased: 2017-09-28
BS EN 62561-3:2017 Lightning protection system components (LPSC) Requirements for isolating spark gaps (ISG)

BS EN 62561-3:2017

Lightning protection system components (LPSC) Requirements for isolating spark gaps (ISG)

CURRENCY
249.6 EUR
Standard number:BS EN 62561-3:2017
Pages:30
Released:2017-09-28
ISBN:978 0 580 90951 1
Status:Standard
DESCRIPTION

BS EN 62561-3:2017


This standard BS EN 62561-3:2017 Lightning protection system components (LPSC) is classified in these ICS categories:
  • 29.020 Electrical engineering in general
  • 91.120.40 Lightning protection

This part of IEC 62561 specifies the requirements and tests for isolating spark gaps (ISG) for lightning protection systems.

ISGs can be used to indirectly bond a lightning protection system to other nearby metalwork where a direct bond is not permissible for functional reasons.

Typical applications include the connection to

  • earth-termination systems of power installations,

  • earth-termination systems of telecommunication systems,

  • auxiliary earth electrodes of voltage-operated, earth fault circuit breakers,

  • rail earth electrode of power and DC railways,

  • measuring earth electrodes for laboratories,

  • installations with cathodic protection and stray current systems,

  • service entry masts for low-voltage overhead cables,

  • bypassing insulated flanges and insulated couplings of pipelines.

This does not cover applications where follow currents occur.

NOTE

Lightning protection system components (LPSC) can also be suitable for use in hazardous conditions such as fire and explosive atmosphere. Due regard will be taken of the extra requirements necessary for the components to be installed in such conditions.