Don't have a credit card? Never mind we support BANK TRANSFER .

PRICES include / exclude VAT
>BSI Standards >23 FLUID SYSTEMS AND COMPONENTS FOR GENERAL USE>23.040 Pipeline components and pipelines>23.040.07 Pipelines and its parts for dictrict heat>25/30501130 DC Draft BS EN 18213-1 District heating and district cooling pipes - Bonded single and twin pipe systems for directly buried hot and cold water networks Part 1: Qualification testing of fitter
immediate downloadReleased: 2025-10-10

25/30501130 DC

Draft BS EN 18213-1 District heating and district cooling pipes - Bonded single and twin pipe systems for directly buried hot and cold water networks Part 1: Qualification testing of fitter

Format
Availability
Price and currency
English Secure PDF
Immediate download
Printable - You are authorized to print 1 copy
22.40 EUR
English Hardcopy
In stock
22.40 EUR
Standard number:25/30501130 DC
Pages:32
Released:2025-10-10
Status:Draft for Comment
DESCRIPTION

25/30501130 DC


This standard 25/30501130 DC Draft BS EN 18213-1 District heating and district cooling pipes - Bonded single and twin pipe systems for directly buried hot and cold water networks is classified in these ICS categories:
  • 23.040.07 Pipelines and its parts for district heat
  • 23.040.99 Other pipeline components
This document specifies the methods of examining the knowledge and skill set of the fitter required to carry out on-site joint casing connections on thermally insulated single and twin pipe systems for directly buried hot and cold water networks according to .The application of these specified methods specifications ensures that the examination is carried out according to a standardised examining procedure.This document covers the following processes: - preparatory works for joint casing assembly; - assembling and testing the elements for surveillance systems; For special surveillance systems it can be important to have additional training.preparing work for joint casing system installation; - assembling sealable joint casing system; - verifying joint tightness (leakage testing); - thermally insulating the joint casing ( PUR foaming or half-shells); - sealing fill & vent openings (weldable or sealable plugs); - assessing overall installation quality of the completed joint connection (non-destructive).