PRICES include / exclude VAT
Homepage>ASTM Standards>59>59.080>59.080.70>ASTM D6747-21 - Standard Guide for Selection of Techniques for Electrical Leak Location of Leaks in Geomembranes
Released: 01.08.2021

ASTM D6747-21 - Standard Guide for Selection of Techniques for Electrical Leak Location of Leaks in Geomembranes

Standard Guide for Selection of Techniques for Electrical Leak Location of Leaks in Geomembranes

Format
Availability
Price and currency
English PDF Redline
Immediate download
77.04 USD
English PDF
Immediate download
64.20 USD
English Hardcopy
In stock
64.20 USD
Standard number:D6747-21
Released:01.08.2021
Status:Active
Pages:14
Section:04.13
Keywords:bare geomembrane survey; covered geomembrane survey; damage; dipole method; electrical leak detection method; electrical leak location; electrical leak location method; electrical leak location system; exposed geomembrane; geoelectric leak location; geomembrane; leak detection; leak location survey; leak survey; liner integrity survey; permanent monitoring system; soil-covered geomembrane; water-covered geomembrane;
DESCRIPTION

1.1 This guide is intended to assist individuals or groups in assessing different options available for locating leaks in installed geomembranes using electrical methods. For clarity, this guide uses the term “leak” to mean holes, punctures, tears, knife cuts, seam defects, cracks, and similar breaches in an installed geomembrane (as defined in 3.2.6).

1.2 This guide does not cover systems that are restricted to seam testing only, nor does it cover systems that may detect leaks non-electrically. It does not cover systems that only detect the presence, but not the location, of leaks.

1.3 (Warning—The electrical methods used for geomembrane leak location could use high voltages, resulting in the potential for electrical shock or electrocution. This hazard might be increased because operations might be conducted in or near water. In particular, a high voltage could exist between the water or earth material and earth ground, or any grounded conductor. These procedures are potentially very dangerous, and can result in personal injury or death. The electrical methods used for geomembrane leak location should be attempted only by qualified and experienced personnel. Appropriate safety measures must be taken to protect the leak location operators as well as other people at the site.)

1.4 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard.

1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.

1.6 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.