Don't have a credit card? Never mind we support BANK TRANSFER .

PRICES include / exclude VAT
>BSI Standards >13 ENVIRONMENT. HEALTH PROTECTION. SAFETY>13.020 Environment protection>13.020.40 Pollution, pollution control and conservation>BS ISO 14404-1:2024 - TC Tracked Changes. Calculation method of carbon dioxide emission intensity from iron and steel production Steel plant with blast furnace
immediate downloadReleased: 2024-09-23
BS ISO 14404-1:2024 - TC Tracked Changes. Calculation method of carbon dioxide emission intensity from iron and steel production Steel plant with blast furnace

BS ISO 14404-1:2024 - TC

Tracked Changes. Calculation method of carbon dioxide emission intensity from iron and steel production Steel plant with blast furnace

Format
Availability
Price and currency
English Secure PDF
Immediate download
Printable - You are authorized to print 1 copy
405.44 EUR
English Hardcopy
In stock
405.44 EUR
Standard number:BS ISO 14404-1:2024 - TC
Pages:84
Released:2024-09-23
ISBN:978 0 539 33480 7
Status:Tracked Changes
DESCRIPTION

BS ISO 14404-1:2024 - TC


This standard BS ISO 14404-1:2024 - TC Tracked Changes. Calculation method of carbon dioxide emission intensity from iron and steel production is classified in these ICS categories:
  • 13.020.40 Pollution, pollution control and conservation
  • 77.080.01 Ferrous metals in general