Don't have a credit card? Never mind we support BANK TRANSFER .

PRICES include / exclude VAT
Homepage>IEC Standards>IEC 61557-7:2019+AMD1:2023 CSV - Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence
download between 0-24 hoursReleased: 2023-08-25

IEC 61557-7:2019+AMD1:2023 CSV

Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence

Sécurité électrique dans les réseaux de distribution basse tension au plus égale à 1 000 V en courant alternatif et 1 500 V en courant continu - Dispositifs de contrôle, de mesure ou de surveillance de mesures de protection - Partie 7: Ordre de phases

Format
Availability
Price and currency
English/French - Bilingual PDF
Immediate download
183.60 EUR
English/French - Bilingual Hardcopy
in stock
183.60 EUR
Standard number:IEC 61557-7:2019+AMD1:2023 CSV
Released:2023-08-25
Edition:3.1
ICS:17.220.20
Pages (English/French - Bilingual):75
ISBN (English/French - Bilingual):9782832274538
DESCRIPTION

IEC 61557-7:2019+AMD1:2023 CSV

IEC 61557-7:2019+AMD1:2023 specifies the requirements applicable to measuring equipment for testing the phase sequence in three-phase distribution systems. Indication of the phase sequence can be mechanical, visual and/or audible. This document does not apply to additional measurements for other quantities. It does not apply to monitoring relays. IEC 61557-7:2019 cancels and replaces the second edition published in 2007. This edition constitutes a technical revision. This edition includes the following changes with respect to the previous edition:
a) alignment of the structure with that of the whole IEC 61557 series;
b) updated requirements in 4.3 in accordance with new editions of IEC 61010-1 and IEC 61010-031;
c) the information on markings was extended;
d) the information on the operating instructions was extended;
e) complement to the information on the testing of leads;
f) test leads for insulated conductors were introduced;
g) Annex B was added with information on phase sequence tests and indications.