PRICES include / exclude VAT
>UNE standards>UNE EN 62264-3:2017 - Enterprise-control system integration - Part 3: Activity models of manufacturing operations management (Endorsed by Asociación Española de Normalización in May of 2017.)
in stockReleased: 2017-05-01
UNE EN 62264-3:2017 - Enterprise-control system integration - Part 3: Activity models of manufacturing operations management (Endorsed by Asociación Española de Normalización in May of 2017.)

UNE EN 62264-3:2017

Enterprise-control system integration - Part 3: Activity models of manufacturing operations management (Endorsed by Asociación Española de Normalización in May of 2017.)

Integración de sistemas de control empresarial. Parte 3: Modelos de actividad de gestión de operaciones de fabricación (Ratificada por la Asociación Española de Normalización en mayo de 2017.)

Format
Availability
Price and currency
English PDF
Immediate download
Printable
130.90 EUR
English Hardcopy
In stock
130.90 EUR
Standard number:UNE EN 62264-3:2017
Pages:90
Released:2017-05-01
Status:Standard
DESCRIPTION

UNE EN 62264-3:2017

This part of IEC 62264 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this standard are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. The scope of this standard is limited to: a model of the activities associated with manufacturing operations management, Level 3 functions; an identification of some of the data exchanged between Level 3 activities.