PRICES include / exclude VAT
>UNE standards>UNE EN IEC 60964:2019 - Nuclear power plants - Control rooms - Design (Endorsed by Asociación Española de Normalización in August of 2019.)
in stockReleased: 2019-08-01
UNE EN IEC 60964:2019 - Nuclear power plants - Control rooms - Design (Endorsed by Asociación Española de Normalización in August of 2019.)

UNE EN IEC 60964:2019

Nuclear power plants - Control rooms - Design (Endorsed by Asociación Española de Normalización in August of 2019.)

Centrales nucleares de potencia. Salas de control. Diseño (Ratificada por la Asociación Española de Normalización en agosto de 2019.)

Format
Availability
Price and currency
English PDF
Immediate download
Printable
108.90 EUR
English Hardcopy
In stock
108.90 EUR
Standard number:UNE EN IEC 60964:2019
Pages:52
Released:2019-08-01
Status:Standard
DESCRIPTION

UNE EN IEC 60964:2019

This document establishes requirements for the human-machine interface in the main control rooms of nuclear power plants. The document also establishes requirements for the selection of functions, design consideration and organization of the human-machine interface and procedures which are used systematically to verify and validate the functional design. These requirements reflect the application of human factors engineering principles as they apply to the human-machine interface during plant operational states and accident conditions (including design basis and design extension conditions), as defined in IAEA SSR-2/1 and IAEA NP-T-3.16. This document does not cover special purpose or normally unattended control points, such as those provided for shutdown operations from outside the main control room or for radioactive waste handling, or emergency response facilities. Detailed equipment design is outside the scope of this document. The primary purpose of this document is to provide functional design requirements to be used in the design of the main control room of a nuclear power plant to meet operational and safety requirements. This document also provides functional interface requirements which relate to control room staffing, operating procedures, and the training programmes which, together with the human-machine interface, constitute the control room system. This document is intended for application to new control rooms whose conceptual design is initiated after the publication of this document. If it is desired to apply it to an existing control room, special caution must be exercised so that the design basis is kept consistent.