>UNE standards>UNE EN IEC 62381:2024 - Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) (Endorsed by Asociación Española de Normalización in October of 2024.)
in stockReleased: 2024-10-01
UNE EN IEC 62381:2024 - Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) (Endorsed by Asociación Española de Normalización in October of 2024.)

UNE EN IEC 62381:2024

Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) (Endorsed by Asociación Española de Normalización in October of 2024.)

Sistemas de automatización en procesos industriales. Ensayo de aceptación de fábrica (FAT), ensayo de aceptación en emplazamiento (SAT) y ensayo de integración en emplazamiento (SIT) (Ratificada por la Asociación Española de Normalización en octubre de 2024.)

Format
Availability
Price and currency
English PDF
Immediate download
Printable
89.10 EUR
English Hardcopy
In stock
89.10 EUR
Standard number:UNE EN IEC 62381:2024
Pages:50
Released:2024-10-01
Status:Standard
DESCRIPTION

UNE EN IEC 62381:2024

1 Scope 1.1 General applicability This international standard defines requirements and checklists for the Factory Acceptance Test (FAT), the Factory Integration Test (FIT), the Site Acceptance Test (SAT), and the Site Integration Test (SIT). These tests are carried out to demonstrate that the automation system meets the requirements of the applicable specification. The intent of this document is to provide a means for all parties, including the owner, the buyer, and the vendor, to clearly establish and agree on the scope of activities and responsibilities involved in performing these tests in order to achieve a timely delivery and acceptance of the automation system. The activities described in this document can be used to develop test plans adapted to the specific requirements of the process/plant/equipment. The annexes of this document contain checklists which are available for consideration when preparing specific test procedures and documentation for a specific automation system. 1.2 Exclusions 1.2.1 Prior and post activities Engineering and manufacturing activities prior to or after the FAT, FIT, SAT and SIT, such as loop checks and commissioning, are not covered by this standard. 1.2.2 Regulated industries For applications in the pharmaceutical or other highly specialized industries, additional guidelines (for example, Good Automated Manufacturing Practice (GAMP)), definitions and stipulations apply in accordance with other applicable existing standards. 1.2.3 Safety Instrumented Systems IEC 61511 provides requirements for checks and validation of Safety Instrumented Systems. 1.2.4 Manufacturing Execution Systems Testing and verification of Manufacturing Execution Systems (MES) is not covered by this document. 1.2.5 Advanced Process Control Testing and verification of Advanced Process Control (APC) is not covered by this document. 1.2.6 Security for industrial automation and control systems IEC 62443 provides requirements for network and system security.