PRICES include / exclude VAT
>UNE standards>UNE EN ISO 11295:2022 - Plastics piping systems used for the rehabilitation of pipelines - Classification and overview of strategic, tactical and operational activities (ISO 11295:2022)
in stockReleased: 2022-10-11
UNE EN ISO 11295:2022 - Plastics piping systems used for the rehabilitation of pipelines - Classification and overview of strategic, tactical and operational activities (ISO 11295:2022)

UNE EN ISO 11295:2022

Plastics piping systems used for the rehabilitation of pipelines - Classification and overview of strategic, tactical and operational activities (ISO 11295:2022)

Sistemas de canalización en materiales plásticos utilizados en la rehabilitación de sistemas de tuberías. Clasificación y descripción general de actividades estratégicas y operativas. (ISO 11295:2022).

Format
Availability
Price and currency
English PDF
Immediate download
Printable
170.28 EUR
English Hardcopy
In stock
170.28 EUR
Spanish PDF
Immediate download
Printable
141.90 EUR
Spanish Hardcopy
In stock
141.90 EUR
Standard number:UNE EN ISO 11295:2022
Pages:77
Released:2022-10-11
Status:Standard
Pages (Spanish):84
DESCRIPTION

UNE EN ISO 11295:2022

This document sets out the steps of the overall process of pipeline rehabilitation, comprising: Information on strategic activities: a) Investigation and condition assessment of the existing pipeline; b) Pipeline rehabilitation planning; c) Project specification. Information on and requirements for operational activities: d) Application of techniques; e) Documentation of the design and application process. Definitions, classification and description of families of renovation and trenchless replacement techniques are provided, including their areas of application such as underground drainage and sewerage networks and underground water and gas supply networks. NOTE 1 The following aspects are not covered by the scope of this document: new construction provided as network extension; calculation methods to determine, for each viable technique, the characteristics of lining or replacement pipe material needed to secure the desired performance of the rehabilitated pipeline; techniques for local repair. NOTE 2 It is the responsibility of the designer to choose and design the renovation or trenchless replacement pipeline system.