PRICES include / exclude VAT
Homepage>BS Standards>91 CONSTRUCTION MATERIALS AND BUILDING>91.220 Construction equipment>BS EN 12811-1:2003 Temporary works equipment Scaffolds. Performance requirements and general design
Sponsored link
immediate downloadReleased: 2004-06-16
BS EN 12811-1:2003 Temporary works equipment Scaffolds. Performance requirements and general design

BS EN 12811-1:2003

Temporary works equipment Scaffolds. Performance requirements and general design

Format
Availability
Price and currency
English Secure PDF
Immediate download
386.67 USD
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
38.67 USD
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
116.00 USD
English Hardcopy
In stock
386.67 USD
Standard number:BS EN 12811-1:2003
Pages:60
Released:2004-06-16
ISBN:0 580 43279 3
Status:Standard
DESCRIPTION

BS EN 12811-1:2003


This standard BS EN 12811-1:2003 Temporary works equipment is classified in these ICS categories:
  • 91.220 Construction equipment

This European Standard specifies performance requirements and methods of structural and general design for access and working scaffolds, referred to from hereon as working scaffolds. Requirements given are for scaffold structures, which rely on the adjacent structures for stability. In general these requirements also apply to other types of working scaffolds. Normal requirements are set down, but there is also provision for special cases.

This European Standard also specifies structural design rules when certain materials are used and general rules for prefabricated equipment.

The standard excludes:

  • platforms suspended by ropes, whether fixed or movable;

  • horizontally movable platforms including Mobile Access Towers (MAT);

  • power-operated platforms;

  • scaffolds used as protection for roof work;

  • temporary roofs.

NOTE 1 Most working scaffolds are formed from prefabricated components or from tubes and couplers. Some examples of working scaffolds are façade scaffolds, static towers and birdcage scaffolds, but details are not given for all of these.

NOTE 2 Falsework and shoring may be made of the structural components described in this standard, but are not working scaffolds.

NOTE 3 Particular requirements for façade scaffolds made of prefabricated components are specified in EN 12810 -1 and EN 12810-2.


Customers who bought this item also bought
English Secure PDF
Immediate download
277.33 USD
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
27.73 USD
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
83.20 USD
English Hardcopy
In stock
277.33 USD
English Secure PDF
Immediate download
325.33 USD
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
32.53 USD
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
97.60 USD
English Hardcopy
In stock
325.33 USD
English Secure PDF
Immediate download
200.00 USD
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
20.00 USD
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
60.00 USD
English Hardcopy
In stock
200.00 USD
English Secure PDF
Immediate download
277.33 USD
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
27.73 USD
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
83.20 USD
English Hardcopy
In stock
277.33 USD