PRICES include / exclude VAT
Homepage>BS Standards>35 INFORMATION TECHNOLOGY. OFFICE MACHINES>35.200 Interface and interconnection equipment>BS ISO/IEC 14763-2:2019 Information technology. Implementation and operation of customer premises cabling Planning and installation
Sponsored link
immediate downloadReleased: 2020-01-16
BS ISO/IEC 14763-2:2019 Information technology. Implementation and operation of customer premises cabling Planning and installation

BS ISO/IEC 14763-2:2019

Information technology. Implementation and operation of customer premises cabling Planning and installation

Format
Availability
Price and currency
English Secure PDF
Immediate download
486.20 USD
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
48.62 USD
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
145.86 USD
English Hardcopy
In stock
486.20 USD
Standard number:BS ISO/IEC 14763-2:2019
Pages:178
Released:2020-01-16
ISBN:978 0 580 97851 7
Status:Standard
DESCRIPTION

BS ISO/IEC 14763-2:2019


This standard BS ISO/IEC 14763-2:2019 Information technology. Implementation and operation of customer premises cabling is classified in these ICS categories:
  • 35.200 Interface and interconnection equipment

This part of ISO/IEC 14763 specifies requirements for the planning, installation and operation of telecommunications cabling and cabling infrastructures including cabling, pathways, spaces and telecommunications bonds (other than that specified in ISO/IEC 30129) in support of generic cabling standards and associated documents.

The following aspects are addressed:

  1. specification of the installation;

  2. quality assurance;

  3. installation planning;

  4. installation practice;

  5. documentation;

  6. administration;

  7. testing;

  8. inspection;

  9. operation;

  10. maintenance;

  11. repair.

The requirements and recommendations of Clauses 5 to 14 are premises-independent. Annexes C through G contain premises-specific amendments of and additions to these requirements and recommendations.

In addition, this document describes the methodology for the assessment of spaces, pathways, pathway systems and cabling (either installed or planned) in support of remote powering objectives.

This document excludes specific requirements applicable to other cabling systems (e.g. power supply cabling); however, it takes account of the effects other cabling systems may have on the installation of telecommunications cabling (and vice versa) and gives general advice.

This document excludes those aspects of installation associated with the transmission of signals in free space between transmitters, receivers or their associated antenna systems (e.g. wireless, radio, microwave or satellite).

This document is applicable to certain hazardous environments but does not exclude additional requirements which are applicable in particular circumstances (e.g. electricity supply and electrified railways).

Safety and electromagnetic compatibility (EMC) requirements are outside the scope of this document and are covered by other standards and regulations. However, information given in this document can be of assistance in meeting these standards and regulations.