PRICES include / exclude VAT
Homepage>IEC Standards>IEC 61850-4:2011+AMD1:2020 CSV - Communication networks and systems for power utility automation - Part 4: System and project management
Sponsored link
download between 0-24 hoursReleased: 2020-11-03
IEC 61850-4:2011+AMD1:2020 CSV - Communication networks and systems for power utility automation - Part 4: System and project management

IEC 61850-4:2011+AMD1:2020 CSV

Communication networks and systems for power utility automation - Part 4: System and project management

Format
Availability
Price and currency
English PDF
Immediate download
537.78 USD
English Hardcopy
in stock
537.78 USD
Standard number:IEC 61850-4:2011+AMD1:2020 CSV
Released:2020-11-03
Language:English
DESCRIPTION

IEC 61850-4:2011+AMD1:2020 CSV

IEC 61850-4:2011+A1:2020 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This consolidated version consists of the second edition (2011) and its amendment 1 (2020). Therefore, no need to order amendment in addition to this publication. This publication is of core relevance for Smart Grid.