PRICES include / exclude VAT
Homepage>IEEE Standards>33 TELECOMMUNICATIONS. AUDIO AND VIDEO ENGINEERING>33.040 Telecommunication systems>33.040.40 Data communication networks>IEEE 2030.100-2017 - IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System
Released: 19.06.2017

IEEE 2030.100-2017 - IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System

IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System

Format
Availability
Price and currency
English PDF
Immediate download
92.67 USD
English Hardcopy
In stock
118.80 USD
Standard number:IEEE 2030.100-2017
Released:19.06.2017
ISBN:978-1-5044-4032-5
Pages:67
Status:Active
Language:English
DESCRIPTION

IEEE 2030.100-2017

This recommended practice outlines the necessary steps and procedures implementers of IEC 61850 in substations should undertake in a multi-vendor equipment environment. It is not the intent of this recommended practice to change the IEC 61850 standard, but treats the standard as providing a set of tools engineers and integrators could use in substation protection, automation, and control systems.

IEC 61850 has been promoted as an interoperability standard, but to date, interoperability among vendors has been achieved only at a communications level. When actually implementing the various substation functions, the user could be forced to change methods between vendors due to the flexibility and options provided for in IEC 61850. Additionally, IEC 61850 requires significant changes to the design, construction, and commissioning of a substation. Hard-wired signals are replaced by logical bits being communicated over Ethernet networks, documentation and naming conventions are distinctly different from existing substation practice, and device functionality could be assigned, and even migrate, in an operational environment. Users will also require a methodology to integrate IEC 61850 and non-IEC 61850 operational practices in their system as both approaches will have to exist side by side for many years. This recommended practice will provide a starting point for those users who would like to migrate to an IEC 61850 substation approach and establish baseline functionality to which vendors could adhere with confidence of achieving interoperability with other vendors.

New IEEE Standard - Active. The steps and procedures a user should undertake to implement an IEC 61850 substation in both a single and multi-vendor equipment environment are outlined in this recommended practice. Intelligent electronic device (IED) specifi cation, procurement, configuration, and documentation to develop a general design philosophy that transforms the IEC 61850 standard are addressed in this recommended practice, using this as a practical working implementation guide. A general overview of an IEC 61850 implementation is given in this recommended practice. Future work may develop more detail behind the topics presented herein.