PRICES include / exclude VAT
Homepage>BS Standards>11 HEALTH CARE TECHNOLOGY>11.040 Medical equipment>11.040.01 Medical equipment in general>PD IEC/TR 80001-2-1:2012 Application of risk management for IT-networks incorporating medical devices Step-by-step risk management of medical IT-networks. Practical applications and examples
Sponsored link
immediate downloadReleased: 2012-07-10
PD IEC/TR 80001-2-1:2012 Application of risk management for IT-networks incorporating medical devices Step-by-step risk management of medical IT-networks. Practical applications and examples

PD IEC/TR 80001-2-1:2012

Application of risk management for IT-networks incorporating medical devices Step-by-step risk management of medical IT-networks. Practical applications and examples

Format
Availability
Price and currency
English Secure PDF
Immediate download
377.00 USD
English Hardcopy
In stock
377.00 USD
Standard number:PD IEC/TR 80001-2-1:2012
Pages:70
Released:2012-07-10
ISBN:978 0 580 75099 1
Status:Standard
DESCRIPTION

PD IEC/TR 80001-2-1:2012


This standard PD IEC/TR 80001-2-1:2012 Application of risk management for IT-networks incorporating medical devices is classified in these ICS categories:
  • 11.040.01 Medical equipment in general
  • 35.240.80 IT applications in health care technology
IEC/TR 80001-2-1:2012(E), which is a technical report, is a step-by-step guide to help in the application of risk management when creating or changing a medical IT-network. It provides easy to apply steps, examples, and information helping in the identification and control of risks. All relevant requirements in IEC 80001-1:2010 are addressed and links to other clauses and subclauses of IEC 80001-1 are addressed where appropriate (e.g. handover to release management and monitoring). This technical report focuses on practical risk management. It is not intended to provide a full outline or explanation of all requirements that are satisfactorily covered by IEC 80001-1. This step-by-step guidance follows a 10-step process that follows subclause 4.4 of IEC 80001-1:2010, which specifically addresses risk analysis, risk evaluation and risk control. These activities are embedded within the full life cycle risk management process. They can never be the first step, as risk management follows the general process model which sets planning before any action.