PRICES include / exclude VAT
Homepage>BS Standards>29 ELECTRICAL ENGINEERING>29.130 Switchgear and controlgear>29.130.10 High voltage switchgear and controlgear>PD IEC/TS 62271-210:2013 High-voltage switchgear and controlgear Seismic qualification for metal enclosed and solid-insulation enclosed switchgear and controlgear assemblies for rated voltages above 1 kV and up to and including 52 kV
Sponsored link
immediate downloadReleased: 2013-02-28
PD IEC/TS 62271-210:2013 High-voltage switchgear and controlgear Seismic qualification for metal enclosed and solid-insulation enclosed switchgear and controlgear assemblies for rated voltages above 1 kV and up to and including 52 kV

PD IEC/TS 62271-210:2013

High-voltage switchgear and controlgear Seismic qualification for metal enclosed and solid-insulation enclosed switchgear and controlgear assemblies for rated voltages above 1 kV and up to and including 52 kV

Format
Availability
Price and currency
English Secure PDF
Immediate download
317.20 USD
English Hardcopy
In stock
317.20 USD
Standard number:PD IEC/TS 62271-210:2013
Pages:34
Released:2013-02-28
ISBN:978 0 580 69498 1
Status:Standard
DESCRIPTION

PD IEC/TS 62271-210:2013


This standard PD IEC/TS 62271-210:2013 High-voltage switchgear and controlgear is classified in these ICS categories:
  • 29.130.10 High voltage switchgear and controlgear

This part of IEC 62271 applies to metal enclosed switchgear and controlgear assemblies complying with IEC 62271-200 for metal enclosed and IEC 62271-201 for solid-insulation enclosed, ground or floor mounted, intended to be used under seismic conditions.

The seismic qualification of the switchgear and controlgear assemblies takes into account any auxiliary and the control equipment mounted directly on the assembly.

It will specify seismic severity levels, acceptance levels, and give a choice of methods that may be applied to demonstrate the performance of high-voltage switchgear and controlgear assemblies for which seismic qualification is required.

The seismic qualification of the switchgear and controlgear assemblies is only performed upon request.