PRICES include / exclude VAT
in stockReleased: 2021-02-01
UNE EN 61850-4:2011/A1:2020
Communication networks and systems for power utility automation - Part 4: System and project management (Endorsed by Asociación Española de Normalización in February of 2021.)
Sistemas y redes de comunicación para la automatización de las redes de potencia de las compañías eléctricas. Parte 4: Gestión del sistema y gestión del proyecto. (Ratificada por la Asociación Española de Normalización en febrero de 2021.)
Format
Availability
Price and currency
English PDF
Immediate download
Printable
91.88 USD
English Hardcopy
In stock
91.88 USD
| Standard number: | UNE EN 61850-4:2011/A1:2020 |
| Pages: | 27 |
| Released: | 2021-02-01 |
| Status: | Amendment |
DESCRIPTION
UNE EN 61850-4:2011/A1:2020
Replace the text of the first paragraph with the following: This part of IEC 61850 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like substation automation systems (SAS). It defines the system and project management for UAS with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements.
